{"id":7691,"date":"2020-07-21T05:45:48","date_gmt":"2020-07-21T05:45:48","guid":{"rendered":"https:\/\/old.mup-group.com\/?p=7691"},"modified":"2020-07-21T05:45:48","modified_gmt":"2020-07-21T05:45:48","slug":"spatenstich-fuer-forschungsneubau-scale","status":"publish","type":"post","link":"https:\/\/old.mup-group.com\/en\/groundbreaking-ceremony-for-new-research-building-scale\/","title":{"rendered":"Groundbreaking ceremony for new SCALE research building - Interdisciplinary cutting-edge research in production technology and mechanical engineering"},"content":{"rendered":"<h1>Groundbreaking ceremony for new SCALE research building - <br \/>Interdisciplinary cutting-edge research in production technology and mechanical engineering<\/h1>\n<p style=\"text-align: justify;\">More efficient production methods for large components, such as those used in wind turbines, aircraft and ships: In future, around 160 employees of Leibniz Universit\u00e4t Hannover (LUH) will be working on this topic in the new research building \"SCALE - Scalable Production Systems of the Future\". The construction project has now started with the symbolic ground-breaking ceremony on the Mechanical Engineering Campus in Garbsen.<\/p>\n<p style=\"text-align: justify;\">In future, so-called \"scale-independent production techniques\" will be researched in the new building. Increasingly large components achieve enormous efficiency gains in operation in many branches of industry - for example in the construction of wind turbines, aircraft or ships. However, with such large elements, which are also very individual, conventional manufacturing, processing and transport methods reach their limits. The goal is therefore to develop mobile, autonomous manufacturing techniques and methods that can be moved freely in space and thus process components for a wide variety of plants, regardless of their size.<\/p>\n<p style=\"text-align: justify;\">Construction of the building, which will cover more than 5,000 square metres, is to begin as early as next year. Completion is planned for 2023.<br \/>University President Prof. Dr. Volker Epping is also very pleased about the start of the new building project: \"The research building promotes top-level research at our university in an exemplary manner. It is located at the Faculty of Mechanical Engineering, but the association of the Faculties of Civil Engineering and Geodesy, Economics and Electrical Engineering and Computer Science promotes interdisciplinary exchange and creates excellent university-wide synergies.\"<\/p>\n<p style=\"text-align: justify;\">The new research building will be built in the immediate vicinity of Leibniz Universit\u00e4t's Production Technology Centre Hannover (PZH), to the east between PZH and Bremer Stra\u00dfe. After the construction site has been set up, the actual construction work started in spring 2020 (general planner: HENN Architekten Berlin). Mull und Partner Hannover is responsible for the land management.<br \/>The construction and installation of the large-scale facilities will cost a total of about 49.6 million euros, half of which will be paid by the state of Lower Saxony and half by the federal government. Completion is planned for 2022.<\/p>\n<p style=\"text-align: justify;\">More on this in the following link of the portal of the region and the state capital Hannover (19.12.2020): <a href=\"https:\/\/www.hannover.de\/Service\/Presse-Medien\/Hannover.de\/Aktuelles\/Wirtschaft-Wissenschaft-2019\/Spatenstich-f%C3%BCr-Forschungsneubau-SCALE\">https:\/\/www.hannover.de\/Service\/Presse-Medien\/Hannover.de\/Aktuelles\/Wirtschaft-Wissenschaft-2019\/Spatenstich-f%C3%BCr-Forschungsneubau-SCALE<\/a><\/p>\n\n<p><strong>Our business areas<\/strong><\/p>\n<p><a href=\"\/en\/umwelt-und-geotechnik\/\">Environmental and geotechnical engineering<\/a><br \/> <a href=\"\/en\/bau-projektmanagement\/\">Construction and project management<\/a><br \/> <a href=\"\/en\/erneuerbare-energien\/\">Renewable energies<\/a><br \/> <a href=\"\/en\/immobilienentwicklung\/\">Real estate development<\/a><br \/> <a href=\"\/en\/infrastruktur\/\"> Infrastructure<\/a><br \/> <a href=\"\/en\/wasserwirtschaft\/\">Water management<\/a><\/p>\n\n<p><strong>Our companies<\/strong><\/p>\n<p><a href=\"https:\/\/mullundpartner.de\/\" target=\"_blank\" rel=\"noopener noreferrer\">M&amp;P Engineering Company<\/a><br \/> <a href=\"https:\/\/www.mup-muc.de\">M&amp;P Engineering Company Munich<\/a><br \/> <a href=\"http:\/\/www.tucherundpartner.de\">T&amp;P Beratende Ingenieure<\/a><br \/> <a href=\"http:\/\/www.prinzpartner.de\">P&amp;P Real Estate Consulting<\/a><br \/> <a href=\"http:\/\/www.pbimmobilienmanagement.com\">P&amp;B Real Estate Management<br \/> <\/a>P&amp;M Project Management<br \/> <a href=\"https:\/\/mup-ibl.com\/\">M&amp;P Umwelttechnik<\/a><\/p>\n\n\n<p><span style=\"font-size: small;\"><strong><span style=\"font-family: inherit;\">Please contact us<\/span><\/strong><\/span><\/p>\n<p><span style=\"font-size: small;\"><a href=\"https:\/\/old.mup-group.com\/en\/contact\/\"><span style=\"font-family: inherit; font-weight: normal;\">To the contact form<\/span><\/a><\/span><\/p>\n<p><span style=\"font-size: small;\"><strong><span style=\"font-family: inherit;\">\u00a0Follow us on<\/span><\/strong><\/span><\/p>\n<p><span style=\"font-family: inherit; font-weight: normal; font-size: small;\"><strong><a href=\"http:\/\/linkedin.com\/company\/mup-group\"><img decoding=\"async\" class=\"wp-image-7341 alignleft\" src=\"https:\/\/old.mup-group.com\/wp-content\/uploads\/2020\/02\/Linkedin-icon-150x150.png\" alt=\"Icon LinkedIn\" width=\"28\" height=\"28\" srcset=\"https:\/\/old.mup-group.com\/wp-content\/uploads\/2020\/02\/Linkedin-icon-150x150.png 150w, https:\/\/old.mup-group.com\/wp-content\/uploads\/2020\/02\/Linkedin-icon-300x300.png 300w, https:\/\/old.mup-group.com\/wp-content\/uploads\/2020\/02\/Linkedin-icon-500x500.png 500w, https:\/\/old.mup-group.com\/wp-content\/uploads\/2020\/02\/Linkedin-icon.png 512w\" sizes=\"(max-width: 28px) 100vw, 28px\" \/><\/a><\/strong><\/span><\/p>\n<p><span style=\"font-family: inherit; font-weight: normal; font-size: small;\"><strong>\u00a0<\/strong><\/span><\/p>\n<h6><span style=\"font-size: small;\"><span style=\"font-family: inherit;\"><a title=\"Imprint &amp; Data Protection\" href=\"https:\/\/old.mup-group.com\/en\/impressum\/?et_fb=1&amp;PageSpeed=off\" target=\"_blank\" rel=\"noopener noreferrer\">Imprint &amp; Data Protection<\/a><\/span><\/span><\/h6>","protected":false},"excerpt":{"rendered":"<p>Ground-breaking ceremony for new SCALE research building - interdisciplinary cutting-edge research in production technology and mechanical engineering More efficient production methods for large components, such as those used in<\/p>","protected":false},"author":3,"featured_media":7692,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-7691","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nachrichten"],"acf":[],"_links":{"self":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/posts\/7691","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/comments?post=7691"}],"version-history":[{"count":0,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/posts\/7691\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/media\/7692"}],"wp:attachment":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/media?parent=7691"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/categories?post=7691"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/tags?post=7691"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}