{"id":8667,"date":"2020-11-03T08:25:42","date_gmt":"2020-11-03T08:25:42","guid":{"rendered":"https:\/\/old.mup-group.com\/?p=8667"},"modified":"2020-11-03T08:25:42","modified_gmt":"2020-11-03T08:25:42","slug":"unser-neuer-kollege-lars-wolpmann-2","status":"publish","type":"post","link":"https:\/\/old.mup-group.com\/en\/our-new-colleague-lars-wolpmann-2\/","title":{"rendered":"Our new colleague - Lars Wolpmann"},"content":{"rendered":"<h1>Our new colleague - Lars Wolpmann<\/h1>\n<p>Today, M&amp;P Ingenieurgesellschaft welcomes Lars Wolpmann to the team in Hamburg:<\/p>\n<p>Lars Wolpmann has a Master of Science in Geosciences from the Leibniz University of Hanover with the following degrees\u00a0<\/p>\n<p>Focus on applied geology and geophysics , sedimentary systems and tectonics.<\/p>\n<p>The topic of his Master's thesis was: \"The use of medium-depth geothermal energy in Lower Saxony using the example of the Valanginium (Lower Cretaceous).<\/p>\n<p>- Reservoir simulation of borehole doublets under different geological boundary conditions\".<\/p>\n<p>Before that, Lars did a Bachelor of Science in Geosciences at the University of Bremen.<\/p>\n\n\n<p><i>#<\/i><i>newemployee<\/i><i> #<\/i><i>mullundpartner<\/i><i> #<\/i><i>engineeringforabettertomorrow<\/i><i> #<\/i><i>team<\/i><i> #<\/i><i>joinus<\/i><i> #<\/i><i>welcome<\/i><\/p>\n\n<p><strong>Our business areas<\/strong><\/p>\n<p><a href=\"\/en\/umwelt-und-geotechnik\/\">Environmental and geotechnical engineering<\/a><br \/> <a href=\"\/en\/bau-projektmanagement\/\">Construction and project management<\/a><br \/> <a href=\"\/en\/erneuerbare-energien\/\">Renewable energies<\/a><br \/> <a href=\"\/en\/immobilienentwicklung\/\">Real estate development<\/a><br \/> <a href=\"\/en\/infrastruktur\/\"> Infrastructure<\/a><br \/> <a href=\"\/en\/wasserwirtschaft\/\">Water management<\/a><\/p>\n\n<p><strong>Our companies<\/strong><\/p>\n<p><a href=\"https:\/\/mullundpartner.de\/\" target=\"_blank\" rel=\"noopener noreferrer\">M&amp;P Engineering Company<\/a><br \/> <a href=\"https:\/\/www.mup-muc.de\">M&amp;P Engineering Company Munich<\/a><br \/> <a href=\"http:\/\/www.tucherundpartner.de\">T&amp;P Beratende Ingenieure<\/a><br \/> <a href=\"http:\/\/www.prinzpartner.de\">P&amp;P Real Estate Consulting<\/a><br \/> <a href=\"http:\/\/www.pbimmobilienmanagement.com\">P&amp;B Real Estate Management<br \/> <\/a>P&amp;M Project Management<br \/> <a href=\"https:\/\/mup-ibl.com\/\">M&amp;P Umwelttechnik<\/a><\/p>\n\n\n<p><span style=\"font-size: small;\"><strong><span style=\"font-family: inherit;\">Please contact us<\/span><\/strong><\/span><\/p>\n<p><span style=\"font-size: small;\"><a href=\"https:\/\/old.mup-group.com\/en\/contact\/\"><span style=\"font-family: inherit; font-weight: normal;\">To the contact form<\/span><\/a><\/span><\/p>\n<p><span style=\"font-size: small;\"><strong><span style=\"font-family: inherit;\">\u00a0Follow us on<\/span><\/strong><\/span><\/p>\n<p><span style=\"font-family: inherit; font-weight: normal; font-size: small;\"><strong><a href=\"http:\/\/linkedin.com\/company\/mup-group\"><img decoding=\"async\" class=\"wp-image-7341 alignleft\" src=\"https:\/\/old.mup-group.com\/wp-content\/uploads\/2020\/02\/Linkedin-icon-150x150.png\" alt=\"Icon LinkedIn\" width=\"28\" height=\"28\" srcset=\"https:\/\/old.mup-group.com\/wp-content\/uploads\/2020\/02\/Linkedin-icon-150x150.png 150w, https:\/\/old.mup-group.com\/wp-content\/uploads\/2020\/02\/Linkedin-icon-300x300.png 300w, https:\/\/old.mup-group.com\/wp-content\/uploads\/2020\/02\/Linkedin-icon-500x500.png 500w, https:\/\/old.mup-group.com\/wp-content\/uploads\/2020\/02\/Linkedin-icon.png 512w\" sizes=\"(max-width: 28px) 100vw, 28px\" \/><\/a><\/strong><\/span><\/p>\n<p><span style=\"font-family: inherit; font-weight: normal; font-size: small;\"><strong>\u00a0<\/strong><\/span><\/p>\n<h6><span style=\"font-size: small;\"><span style=\"font-family: inherit;\"><a title=\"Imprint &amp; Data Protection\" href=\"https:\/\/old.mup-group.com\/en\/impressum\/?et_fb=1&amp;PageSpeed=off\" rel=\"noopener noreferrer\">Imprint &amp; Data Protection<\/a><\/span><\/span><\/h6>","protected":false},"excerpt":{"rendered":"<p>Our new colleague - Lars Wolpmann Today, M&amp;P Ingenieurgesellschaft welcomes Lars Wolpmann to the team in Hamburg: Lars Wolpmann has<\/p>","protected":false},"author":3,"featured_media":8609,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-8667","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nachrichten"],"acf":[],"_links":{"self":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/posts\/8667","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/comments?post=8667"}],"version-history":[{"count":0,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/posts\/8667\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/media\/8609"}],"wp:attachment":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/media?parent=8667"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/categories?post=8667"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/tags?post=8667"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}