{"id":8785,"date":"2020-11-18T08:40:37","date_gmt":"2020-11-18T08:40:37","guid":{"rendered":"https:\/\/old.mup-group.com\/?p=8785"},"modified":"2020-11-18T08:40:37","modified_gmt":"2020-11-18T08:40:37","slug":"interview-vera-hauer","status":"publish","type":"post","link":"https:\/\/old.mup-group.com\/en\/interview-vera-hauer\/","title":{"rendered":"Interview with Vera Hauer on efficient working methods using digital construction supervision"},"content":{"rendered":"<h1>Interview with Vera Hauer on efficient working methods using digital construction supervision<\/h1>\n<p>Vera Hauer, civil engineer, has been part of the team at Tucher Beratende Ingenieure in the heart of Munich since 2017. As a project manager, she is responsible for the supervision of new residential buildings. In this job, she has to manage the construction sites with a great deal of overview and organisation so that the projects are completed on time and on budget with the highest standards of quality.<\/p>\n<p>In order to provide this service as efficiently as possible, Tucher und Partner has been handling construction projects using digital construction supervision since 2018. With the help of construction management software, successful and targeted coordination and management of the construction measures is ensured. In this way, Tucher und Partner ensures a smooth construction process, seamless construction documentation and complete defect management on behalf of its clients in order to achieve the best results for the respective construction projects.<\/p>\n<p>The construction management software Capmo asked Vera Hauer about her way of working, you can find the interview here:<\/p>\n<p><a href=\"https:\/\/www.capmo.de\/erfolgsgeschichten\/tucher-partner-digitale-bauuberwachung\/\">https:\/\/www.capmo.de\/erfolgsgeschichten\/tucher-partner-digitale-bauuberwachung\/<\/a><\/p>\n<p>#m&amp;pgroup #engineeringforabettertomorrow #team #inside #digitalism #construction\u00a0<\/p>\n\n\n\n<p><strong>Our business areas<\/strong><\/p>\n<p><a href=\"\/en\/umwelt-und-geotechnik\/\">Environmental and geotechnical engineering<\/a><br \/> <a href=\"\/en\/bau-projektmanagement\/\">Construction and project management<\/a><br \/> <a href=\"\/en\/erneuerbare-energien\/\">Renewable energies<\/a><br \/> <a href=\"\/en\/immobilienentwicklung\/\">Real estate development<\/a><br \/> <a href=\"\/en\/infrastruktur\/\"> Infrastructure<\/a><br \/> <a href=\"\/en\/wasserwirtschaft\/\">Water management<\/a><\/p>\n\n<p><strong>Our companies<\/strong><\/p>\n<p><a href=\"https:\/\/mullundpartner.de\/\" target=\"_blank\" rel=\"noopener noreferrer\">M&amp;P Engineering Company<\/a><br \/> <a href=\"https:\/\/www.mup-muc.de\">M&amp;P Engineering Company Munich<\/a><br \/> <a href=\"http:\/\/www.tucherundpartner.de\">T&amp;P Beratende Ingenieure<\/a><br \/> <a href=\"http:\/\/www.prinzpartner.de\">P&amp;P Real Estate Consulting<\/a><br \/> <a href=\"http:\/\/www.pbimmobilienmanagement.com\">P&amp;B Real Estate Management<br \/> <\/a>P&amp;M Project Management<br \/> <a href=\"https:\/\/mup-ibl.com\/\">M&amp;P Umwelttechnik<\/a><\/p>\n\n\n<p><span style=\"font-size: small;\"><strong><span style=\"font-family: inherit;\">Please contact us<\/span><\/strong><\/span><\/p>\n<p><span style=\"font-size: small;\"><a href=\"https:\/\/old.mup-group.com\/en\/contact\/\"><span style=\"font-family: inherit; font-weight: normal;\">To the contact form<\/span><\/a><\/span><\/p>\n<p><span style=\"font-size: small;\"><strong><span style=\"font-family: inherit;\">\u00a0Follow us on<\/span><\/strong><\/span><\/p>\n<p><span style=\"font-family: inherit; font-weight: normal; font-size: small;\"><strong><a href=\"http:\/\/linkedin.com\/company\/mup-group\"><img decoding=\"async\" class=\"wp-image-7341 alignleft\" src=\"https:\/\/old.mup-group.com\/wp-content\/uploads\/2020\/02\/Linkedin-icon-150x150.png\" alt=\"Icon LinkedIn\" width=\"28\" height=\"28\" srcset=\"https:\/\/old.mup-group.com\/wp-content\/uploads\/2020\/02\/Linkedin-icon-150x150.png 150w, https:\/\/old.mup-group.com\/wp-content\/uploads\/2020\/02\/Linkedin-icon-300x300.png 300w, https:\/\/old.mup-group.com\/wp-content\/uploads\/2020\/02\/Linkedin-icon-500x500.png 500w, https:\/\/old.mup-group.com\/wp-content\/uploads\/2020\/02\/Linkedin-icon.png 512w\" sizes=\"(max-width: 28px) 100vw, 28px\" \/><\/a><\/strong><\/span><\/p>\n<p><span style=\"font-family: inherit; font-weight: normal; font-size: small;\"><strong>\u00a0<\/strong><\/span><\/p>\n<h6><span style=\"font-size: small;\"><span style=\"font-family: inherit;\"><a title=\"Imprint &amp; Data Protection\" href=\"https:\/\/old.mup-group.com\/en\/impressum\/?et_fb=1&amp;PageSpeed=off\" rel=\"noopener noreferrer\">Imprint &amp; Data Protection<\/a><\/span><\/span><\/h6>","protected":false},"excerpt":{"rendered":"<p>Interview with Vera Hauer on efficient working methods using digital construction supervision Vera Hauer, a civil engineer, has been part of the team at<\/p>","protected":false},"author":3,"featured_media":8787,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-8785","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nachrichten"],"acf":[],"_links":{"self":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/posts\/8785","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/comments?post=8785"}],"version-history":[{"count":0,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/posts\/8785\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/media\/8787"}],"wp:attachment":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/media?parent=8785"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/categories?post=8785"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/tags?post=8785"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}