{"id":9537,"date":"2021-03-03T09:21:57","date_gmt":"2021-03-03T09:21:57","guid":{"rendered":"https:\/\/old.mup-group.com\/?p=9537"},"modified":"2021-03-03T09:21:57","modified_gmt":"2021-03-03T09:21:57","slug":"geothermie-check","status":"publish","type":"post","link":"https:\/\/old.mup-group.com\/en\/geothermal-check\/","title":{"rendered":"Geothermal Check - the first step towards climate-neutral real estate"},"content":{"rendered":"<h1><strong>Geothermal Check - the first step towards climate-neutral real estate <\/strong><\/h1>\n<p>The Climate Protection Plan 2050 summarises the Federal Government's climate policy principles and goals. It describes the path to a largely greenhouse gas-neutral Germany.<\/p>\n<p>The real estate sector plays a central role in the Climate Protection Plan. In addition to the long-term goal, it is also necessary to reduce greenhouse gas emissions by approx. 66 % by 2030 compared to 1990. In order to achieve this very ambitious goal, the use of environmental heat is required. The most effective and sustainable form of environmental heat is geothermal heat, which can also be used cost-effectively on many properties.<\/p>\n<p>According to the German Energy Agency (DENA), only 800,000 heat pump systems were operated in residential buildings in 2018. However, depending on the scenario, up to 7.9 million heat pumps are needed by 2030 and up to 16.7 million heat pumps by 2050 to achieve the climate targets.<\/p>\n<p>Within the framework of a geothermal check or a geothermal feasibility study, our experts from Mull und Partner evaluate the various technical forms of use for your specific property from different points of view. By combining heating and cooling, geothermal energy can also be temporarily stored in the ground during the seasons, thus reducing system efficiency and costs.<\/p>\n<p>More on the Federal Government's Climate Protection Plan 2050: <a href=\"https:\/\/www.bmu.de\/themen\/klima-energie\/klimaschutz\/nationale-klimapolitik\/klimaschutzplan-2050\/\">https:\/\/www.bmu.de\/themen\/klima-energie\/klimaschutz\/nationale-klimapolitik\/klimaschutzplan-2050\/<\/a><\/p>\n<p>#mullandpartner #engineeringforabettertomorrow #whatwedo #Climateprotectionplan2050 #Quarter concept #Geothermal energy #Waermeepump #renewableenergy<\/p>\n<p><strong>Business areas<\/strong><\/p>\n<p><a href=\"\/en\/umwelt-und-geotechnik\/\">Environmental and geotechnical engineering<\/a><br \/><a href=\"\/en\/bau-projektmanagement\/\">Construction and project management<\/a><br \/><a href=\"\/en\/erneuerbare-energien\/\">Renewable energies<\/a><br \/><a href=\"\/en\/immobilienentwicklung\/\">Real estate development<\/a><br \/><a href=\"\/en\/infrastruktur\/\"> Infrastructure<\/a><br \/><a href=\"\/en\/wasserwirtschaft\/\">Water management<\/a><\/p>\n\n<p><strong>Societies<\/strong><\/p>\n<p><a href=\"https:\/\/mullundpartner.de\/\" target=\"_blank\" rel=\"noopener noreferrer\">M&amp;P Engineering Company<\/a><br \/><a href=\"https:\/\/www.mup-muc.de\">M&amp;P Engineering Company Munich<\/a><br \/><a href=\"http:\/\/www.tucherundpartner.de\">T&amp;P Beratende Ingenieure<\/a><br \/><a href=\"http:\/\/www.prinzpartner.de\">P&amp;P Real Estate Consulting<\/a><br \/><a href=\"http:\/\/www.pbimmobilienmanagement.com\">P&amp;B Real Estate Management<br \/><\/a><a href=\"https:\/\/www.pm-mup.com\/\">P&amp;M Project Management<\/a><br \/><a href=\"https:\/\/mup-ibl.com\/\">M&amp;P Umwelttechnik<\/a><\/p>\n\n\n<p><span style=\"font-size: small;\"><strong><span style=\"font-family: inherit;\">Contact<\/span><\/strong><\/span><\/p>\n<p><span style=\"font-size: small;\"><a href=\"https:\/\/old.mup-group.com\/en\/contact\/\"><span style=\"font-family: inherit; font-weight: normal;\">Contact form<\/span><\/a><\/span><\/p>\n<p><span style=\"font-size: small;\"><strong><span style=\"font-family: inherit;\">\u00a0 Follow us<\/span><\/strong><\/span><span style=\"font-family: inherit; font-weight: normal; font-size: small;\"><strong><a href=\"https:\/\/www.instagram.com\/mup_group\/\">\u00a0<\/a><\/strong><\/span><\/p>\n<p><span style=\"font-family: inherit; font-weight: normal; font-size: small;\"><strong><a href=\"https:\/\/www.instagram.com\/mup_group\/\"><img decoding=\"async\" class=\"alignnone wp-image-9440\" src=\"https:\/\/old.mup-group.com\/wp-content\/uploads\/2021\/02\/Insta-neg-292x300.png\" alt=\"\" width=\"19\" height=\"20\" \/><\/a><a href=\"https:\/\/www.facebook.com\/mullundpartnergruppe\"><img decoding=\"async\" class=\"alignnone wp-image-9441 size-full\" src=\"https:\/\/old.mup-group.com\/wp-content\/uploads\/2021\/02\/FB-neg-e1613981531669.png\" alt=\"\" width=\"20\" height=\"20\" \/><\/a>\u00a0 <a href=\"https:\/\/de.linkedin.com\/company\/mup-group\"><img decoding=\"async\" class=\"alignnone wp-image-9442 size-full\" src=\"https:\/\/old.mup-group.com\/wp-content\/uploads\/2021\/02\/LinkedIn-neg-e1613981589118.png\" alt=\"\" width=\"20\" height=\"20\" \/><\/a>\u00a0<a href=\"https:\/\/www.xing.com\/pages\/m-pgroup\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-9444 size-full\" src=\"https:\/\/old.mup-group.com\/wp-content\/uploads\/2021\/02\/XING-neg-e1613981652329.png\" alt=\"\" width=\"20\" height=\"20\" \/><\/a><a href=\"https:\/\/twitter.com\/MuP_Group\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-9443 size-full\" src=\"https:\/\/old.mup-group.com\/wp-content\/uploads\/2021\/02\/Twitter-neg-e1613981691434.png\" alt=\"\" width=\"20\" height=\"20\" \/><\/a><\/strong><\/span><\/p>\n\n<p><a style=\"font-family: inherit;\" title=\"Imprint &amp; Data Protection\" href=\"https:\/\/old.mup-group.com\/en\/impressum\/?et_fb=1&amp;PageSpeed=off\" rel=\"noopener noreferrer\">Imprint &amp; Data Protection<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Geothermal check - the first step towards a climate-neutral property The German government's climate policy principles and goals are summarised in the Climate Action Plan 2050.<\/p>","protected":false},"author":3,"featured_media":9539,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-9537","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nachrichten"],"acf":[],"_links":{"self":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/posts\/9537","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/comments?post=9537"}],"version-history":[{"count":0,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/posts\/9537\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/media\/9539"}],"wp:attachment":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/media?parent=9537"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/categories?post=9537"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/tags?post=9537"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}