{"id":21023,"date":"2023-06-08T00:00:00","date_gmt":"2023-06-08T00:00:00","guid":{"rendered":"https:\/\/ibgw-leipzig.de\/?post_type=projects&#038;p=21023"},"modified":"2023-08-09T11:49:24","modified_gmt":"2023-08-09T11:49:24","slug":"windpark-krummensee-3-hydrologisches-gutachten-fur-vorgezogene-cef-masnahme","status":"publish","type":"projects","link":"https:\/\/old.mup-group.com\/en\/projects\/wind-farm-krummensee-3-hydrological-expertise-for-early-cef-measure\/","title":{"rendered":"Wind farm Krummensee 3 - Hydrological report for early CEF measure"},"content":{"rendered":"<ul class=\"wp-block-list\">\n<li>Focal points: Water balance, hydrology, hydrogeology<\/li>\n\n\n\n<li>Duration 2021<\/li>\n\n\n\n<li>Energy Source GmbH<\/li>\n\n\n\n<li>Contents:\n<ul class=\"wp-block-list\">\n<li>Hydrogeological exploration<\/li>\n\n\n\n<li>Water balance assessment<\/li>\n\n\n\n<li>Area optimisation of the planned standing water<\/li>\n<\/ul>\n<\/li>\n<\/ul>","protected":false},"author":3,"featured_media":0,"parent":0,"template":"","project-category":[106],"class_list":["post-21023","projects","type-projects","status-publish","hentry","project-category-wasser"],"acf":[],"_links":{"self":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/projects\/21023","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/users\/3"}],"wp:attachment":[{"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/media?parent=21023"}],"wp:term":[{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/old.mup-group.com\/en\/wp-json\/wp\/v2\/project-category?post=21023"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}